Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
405
matching recommendationsNAICS | 33232 | Ornamental and Architectural Metal Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0449 # 05 Y:2025 | 05 | 2025 | RECOVER AND REUSE WASTE MATERIAL | $24,000 | $14,060 | n/a |
MS0449 # 06 Y:2025 | 06 | 2025 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $21,369 | $10,437 | n/a |
MS0449 # 03 Y:2025 | 03 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $10,000 | $18,185 | n/a |
MS0449 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,428 | $5,389 | n/a |
MS0449 # 01 Y:2025 | 01 | 2025 | INSTALL REPLACEMENT DOORS | $13,143 | $8,336 | n/a |
MS0449 # 04 Y:2025 | 04 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $11,235 | $15,450 | n/a |
MU0066 # 08 Y:2025 | 08 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $116 | $193 | n/a |
MU0066 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $49,773 | $560,225 | n/a |
MU0066 # 05 Y:2025 | 05 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $189 | $627 | n/a |
MU0066 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $59,971 | $561,792 | n/a |
MU0066 # 03 Y:2025 | 03 | 2025 | USE PHOTOCELL CONTROLS | $302 | $550 | n/a |
MU0066 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $226 | $0 | n/a |
MU0066 # 02 Y:2025 | 02 | 2025 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $762 | $362 | n/a |
MU0066 # 06 Y:2025 | 06 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,303 | $4,440 | n/a |
MU0066 # 07 Y:2025 | 07 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $251 | $242 | n/a |
OK1138 # 04 Y:2025 | 04 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,934 | $20 | n/a |
OK1138 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,561 | $1,950 | n/a |
OK1138 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,839 | $132,837 | n/a |
OK1138 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,811 | $2,884 | n/a |
OK1138 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,449 | $0 | n/a |
OK1138 # 07 Y:2025 | 07 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,338 | $893 | n/a |
OK1138 # 06 Y:2025 | 06 | 2025 | INSULATE BARE EQUIPMENT | $488 | $653 | n/a |
OK1137 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $520 | $1,286 | n/a |
OK1137 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,249 | $160,056 | n/a |
OK1137 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $3,482 | $12,000 | n/a |