IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 3324 Boiler, Tank, and Shipping Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0141 # 09 Y:2015 09 2015 INSTALL TIMERS AND/OR THERMOSTATS $860 $0 Implemented
DL0141 # 08 Y:2015 08 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $3,410 $0 Not Implemented
DL0141 # 07 Y:2015 07 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,770 $0 Implemented
DL0141 # 06 Y:2015 06 2015 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $12,857 $0 Implemented
DL0141 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,730 $43,955 Not Implemented
DL0141 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $12,550 $0 Implemented
DL0141 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,965 $960 Implemented
DL0141 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,730 $8,640 Implemented
DL0141 # 01 Y:2015 01 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,650 $5,120 Implemented
DL0086 # 12 Y:2012 12 2012 RECOVER WASTE HEAT FROM EQUIPMENT $8,850 $10,000 Not Implemented
DL0086 # 14 Y:2012 14 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,250 $300 Not Implemented
DL0086 # 13 Y:2012 13 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,800 $9,700 Not Implemented
DL0086 # 01 Y:2012 01 2012 INSTALL TIMERS AND/OR THERMOSTATS $6,400 $100 Implemented
DL0086 # 11 Y:2012 11 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $493 $450 Not Implemented
DL0086 # 10 Y:2012 10 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $466 $3,100 Not Implemented
DL0086 # 09 Y:2012 09 2012 RECOVER WASTE HEAT FROM EQUIPMENT $7,857 $2,500 Not Implemented
DL0086 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,500 $4,000 Implemented
DL0086 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,250 $9,900 Not Implemented
DL0086 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,740 $3,250 Implemented
DL0086 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,790 $160 Implemented
DL0086 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,790 $100 Not Implemented
DL0086 # 03 Y:2012 03 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,390 $280 Not Implemented
DL0086 # 02 Y:2012 02 2012 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $2,479 $500 Implemented