Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 33241 | Power Boiler and Heat Exchanger Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0255 # 02 Y:2007 | 02 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,004 | $0 | Implemented |
SU0255 # 12 Y:2007 | 12 | 2007 | OPTIMIZE PLANT POWER FACTOR | $563 | $3,344 | Not Implemented |
SU0255 # 11 Y:2007 | 11 | 2007 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $269 | $727 | Not Implemented |
SU0255 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,025 | $32,224 | Not Implemented |
SU0255 # 09 Y:2007 | 09 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,084 | $5,590 | Not Implemented |
SU0255 # 08 Y:2007 | 08 | 2007 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $14,202 | $19,571 | Not Implemented |
SU0255 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $331 | $237 | Not Implemented |
SU0255 # 06 Y:2007 | 06 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $8,489 | $4,993 | Not Implemented |
SU0255 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,293 | $1,300 | Implemented |
SU0255 # 04 Y:2007 | 04 | 2007 | USE SYNTHETIC LUBRICANT | $336 | $0 | Not Implemented |
SU0255 # 03 Y:2007 | 03 | 2007 | PAY BILLS ON TIME TO AVOID LATE FEES | $765 | $0 | Implemented |
SU0255 # 01 Y:2007 | 01 | 2007 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,744 | $0 | Implemented |
MZ0004 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,138 | $2,230 | Implemented |
MZ0004 # 09 Y:2007 | 09 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,600 | $0 | Implemented |
MZ0004 # 08 Y:2007 | 08 | 2007 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $56,125 | $0 | Not Implemented |
MZ0004 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $6,900 | $2,950 | Not Implemented |
MZ0004 # 06 Y:2007 | 06 | 2007 | DISCONNECT BALLASTS | $19,720 | $1,050 | Not Implemented |
MZ0004 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,950 | $24,700 | Not Implemented |
MZ0004 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $184 | $150 | Implemented |
MZ0004 # 03 Y:2007 | 03 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,707 | $1,300 | Not Implemented |
MZ0004 # 02 Y:2007 | 02 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $18,457 | $3,412 | Not Implemented |