IAC Assessment: MZ0004
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0004
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2007
Principal Product oil coolers, water cooler, exhaust gas recooler, charge air cooler
NAICS 332410 - Power Boiler and Heat Exchanger Manufacturing
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $5,000,000-$10,000,000
# of Employees 178
Plant Area (Sq.Ft.) 35,000
Annual Production 1 Units
Production Hrs. Annual 6,324
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $650,000 8,877,336 kWh $0.07
Natural Gas $165,000 16,915 MMBtu $9.75
TOTAL ENERGY COSTS $815,000
RECOMMENDED SAVINGS* $130,781 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,922
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,138
Cost:
$2,230
- - - - $5,138 690 -
-
kWh
-
-
kW-months/year
$5,138
690
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$18,457
Cost:
$3,412
- - - - $18,457 2,241 -
-
kWh
-
-
kW-months/year
$18,457
2,241
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,707
Cost:
$1,300
$5,707 63,452 - - - - $5,707
63,452
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$184
Cost:
$150
$184 2,556 - - - - $184
2,556
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,950
Cost:
$24,700
$13,950 202,356 - - - - $13,950
202,356
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7122 DISCONNECT BALLASTS Savings:
$19,720
Cost:
$1,050
$19,720 279,444 - - - - $19,720
279,444
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,900
Cost:
$2,950
$6,900 131,400 - - - - $6,900
131,400
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$56,125
Cost:
-
- - $56,125 9,577 - - -
-
kWh
$56,125
9,577
kW-months/year
-
-
MMBtu
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$4,600
Cost:
-
$4,600 87,600 - - - - $4,600
87,600
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$130,781
Cost:
$35,792
$51,061 766,808 $56,125 9,577 $23,595 2,931 $51,061
766,808
kWh
$56,125
9,577
kW-months/year
$23,595
2,931
MMBtu
TOTAL IMPLEMENTED Savings:
$9,922
Cost:
$2,380
$4,784 90,156 - - $5,138 690 $4,784
90,156
kWh
-
-
kW-months/year
$5,138
690
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas