IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

682

matching recommendations
Reset
NAICS 33243 Metal Can, Box, and Other Metal Container (Light Gauge) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0369 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,258 $7,350 Implemented
LE0369 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $50,065 $1,470 Implemented
LE0369 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $50,836 $87,600 Implemented
LE0369 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,083 $1,000 Implemented
LE0369 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,023 $32,025 Implemented
NC0491 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,248 $11,314 Implemented
NC0491 # 04 Y:2013 04 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,591 $10,980 Not Implemented
NC0491 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,560 $4,950 Not Implemented
NC0491 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $576 $100 Implemented
NC0491 # 02 Y:2013 02 2013 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,220 $31,024 Not Implemented
NC0491 # 01 Y:2013 01 2013 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $13,288 $25,000 Not Implemented
BD0429 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,975 $200 Implemented
BD0429 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,306 $5,680 Not Implemented
BD0429 # 03 Y:2013 03 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,152 $30 Not Implemented
BD0429 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $666 $25 Not Implemented
BD0429 # 05 Y:2013 05 2013 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $651 $2,300 Not Implemented
BD0429 # 06 Y:2013 06 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $354 $440 Not Implemented
BD0429 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $226 $700 Not Implemented
WV0471 # 01 Y:2013 01 2013 UPGRADE CONTROLS ON COMPRESSORS $10,534 $27,000 Implemented
WV0471 # 02 Y:2013 02 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,009 $3,749 Not Implemented
WV0471 # 03 Y:2013 03 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,454 $6,210 Not Implemented
WV0471 # 04 Y:2013 04 2013 COMBINE UTILITY METERS $5,415 $11,000 Implemented
WV0471 # 05 Y:2013 05 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,088 $1,000 Implemented
WV0471 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,860 $310 Implemented
WV0471 # 07 Y:2013 07 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,543 $0 Implemented