IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

642

matching recommendations
Reset
NAICS 33243 Metal Can, Box, and Other Metal Container (Light Gauge) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0237 # 04 Y:2021 04 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,431 $551 Implemented
UA0237 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $985 $141 Implemented
MZ0294 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $35,523 $60,200 Not Implemented
MZ0294 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $542 $240 Not Implemented
MZ0294 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $506 $50 Implemented
MZ0294 # 04 Y:2020 04 2020 INSTALL SPECTRAL REFLECTORS / DELAMP $519 $160 Not Implemented
MZ0294 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $1,295 $2,760 Implemented
MZ0294 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,816 $13,638 Not Implemented
MZ0294 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $75,290 $44,400 Not Implemented
IC0242 # 06 Y:2020 06 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $9,655 $0 Not Implemented
IC0242 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,675 $4,640 Not Implemented
IC0242 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,839 $0 Not Implemented
IC0242 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,050 $2,715 Not Implemented
IC0242 # 02 Y:2020 02 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,255 $10,230 Not Implemented
IC0242 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,538 $5,100 Not Implemented
IC0240 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,653 $5,000 Implemented
IC0240 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,057 $4,858 Not Implemented
IC0240 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $16,845 $0 Implemented
IC0240 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $30,912 $18,940 Implemented
IC0240 # 02 Y:2020 02 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $260 $444 Implemented
IC0240 # 01 Y:2020 01 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $47,834 $36,263 Implemented
SD0595 # 06 Y:2020 06 2020 COVER OPEN TANKS $551 $818 Not Implemented
SD0595 # 05 Y:2020 05 2020 REPAIR AND ELIMINATE STEAM LEAKS $727 $600 Implemented
SD0595 # 04 Y:2020 04 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,799 $8,000 Not Implemented
SD0595 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $679 $1,983 Implemented