IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 33243 Metal Can, Box, and Other Metal Container (Light Gauge) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0089 # 01 Y:2004 01 2004 MOVE BOILER TO MORE EFFICIENT LOCATION $87,420 $4,860 Implemented
TA0089 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45,060 $540 Implemented
TA0089 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $10,000 $3,200 Implemented
TA0089 # 04 Y:2004 04 2004 USE MINIMUM SAFE OVEN VENTILATION $1,890 $1,500 Implemented
TA0089 # 05 Y:2004 05 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,740 $0 Implemented
UM0266 # 10 Y:2004 10 2004 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $666 $610 Implemented
UM0266 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $1,195 $603 Not Implemented
UM0266 # 08 Y:2004 08 2004 REVISE SMOKE CLEANUP FROM OPERATIONS $1,614 $500 Implemented
UM0266 # 07 Y:2004 07 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,312 $3,500 Not Implemented
UM0266 # 06 Y:2004 06 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,400 $700 Not Implemented
UM0266 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,847 $2,000 Implemented
UM0266 # 04 Y:2004 04 2004 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,182 $1,000 Not Implemented
UM0266 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,042 $900 Implemented
UM0266 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,131 $7,512 Implemented
UM0266 # 01 Y:2004 01 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $11,825 $4,500 Implemented
LE0184 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,017 $30,709 Implemented
LE0184 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,355 $1,500 Implemented
LE0184 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,137 $200 Implemented
LE0184 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,237 $0 Implemented
LE0184 # 03 Y:2004 03 2004 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $15,203 $2,000 Not Implemented
LE0184 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $34,434 $10,000 Implemented
LE0184 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $35,446 $0 Not Implemented