IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
NAICS 33243 Metal Can, Box, and Other Metal Container (Light Gauge) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0165 # 01 Y:2009 01 2009 $35 $81 Not Implemented
IC0165 # 08 Y:2009 08 2009 $465 $0 Not Implemented
IC0165 # 07 Y:2009 07 2009 $6,833 $45,400 Implemented
IC0165 # 06 Y:2009 06 2009 $41,095 $2,038 Not Implemented
IC0165 # 05 Y:2009 05 2009 $197 $485 Implemented
IC0165 # 04 Y:2009 04 2009 $573 $575 Implemented
IC0165 # 02 Y:2009 02 2009 $56 $152 Not Implemented
IC0165 # 03 Y:2009 03 2009 $3,581 $0 Implemented
AM0562 # 01 Y:2009 01 2009 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $40,000 $33,800 Implemented
AM0562 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,050 $2,000 Implemented
AM0562 # 03 Y:2009 03 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $685 $120 Not Implemented
AM0562 # 04 Y:2009 04 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $685 $120 Not Implemented
AM0562 # 05 Y:2009 05 2009 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $500 $2,275 Implemented
AM0562 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $53 Not Implemented
AM0562 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $123 $52 Not Implemented
IA0443 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,934 $20,207 Implemented
IA0443 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,745 $256 Implemented
IA0443 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,968 $3,879 Implemented
IA0443 # 10 Y:2009 10 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,934 $20,000 Not Implemented
IA0443 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,000 $152 Not Implemented
IA0443 # 07 Y:2009 07 2009 RECOVER WASTE HEAT FROM EQUIPMENT $3,188 $500 Not Implemented
IA0443 # 09 Y:2009 09 2009 USE OPTIMUM THICKNESS INSULATION $14,294 $11,978 Not Implemented
IA0443 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,636 $860 Not Implemented
IA0443 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,145 $50 Not Implemented
IA0443 # 08 Y:2009 08 2009 OPTIMIZE PLANT POWER FACTOR $4,398 $4,659 Implemented