Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
459
matching recommendationsNAICS | 332431 | Metal Can Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0239 # 03 Y:2025 | 03 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,251 | $3,566 | n/a |
WM0239 # 05 Y:2025 | 05 | 2025 | INSTALL REPLACEMENT DOORS | $2,866 | $4,605 | n/a |
WM0239 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,613 | $840 | n/a |
WM0239 # 02 Y:2025 | 02 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $30,028 | $22,500 | n/a |
WM0239 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $1,167 | $2,240 | n/a |
WM0239 # 01 Y:2025 | 01 | 2025 | USE SYNTHETIC LUBRICANT | $40,192 | $23,257 | n/a |
WM0229 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,336 | $0 | n/a |
WM0229 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $476 | $460 | n/a |
WM0229 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,880 | $1,455 | n/a |
WM0229 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,572 | $0 | n/a |
WM0229 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,865 | $3,500 | n/a |
WM0229 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $267 | $129 | n/a |
MZ0366 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $147,343 | $2,297,063 | n/a |
MZ0366 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,674 | $14,000 | n/a |
MZ0366 # 01 Y:2024 | 01 | 2024 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $21,410 | $168,000 | n/a |
MZ0366 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,395 | $800 | n/a |
MZ0366 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $11,668 | $59,968 | n/a |
NL0096 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,185 | $29,089 | n/a |
NL0096 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $58,179 | $20,000 | n/a |
NL0096 # 10 Y:2024 | 10 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $364 | $172 | n/a |
NL0096 # 09 Y:2024 | 09 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,634 | $1,540 | n/a |
NL0096 # 08 Y:2024 | 08 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,899 | $11,800 | n/a |
NL0096 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $15,679 | $4,600 | n/a |
NL0096 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $40,407 | $21,500 | n/a |
NL0096 # 05 Y:2024 | 05 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $20,701 | $600 | n/a |