Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
459
matching recommendationsNAICS | 332431 | Metal Can Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0669 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $24,407 | $52 | Implemented |
AM0669 # 02 Y:2014 | 02 | 2014 | METER WASTE WATER | $20,590 | $4,500 | Implemented |
AM0669 # 03 Y:2014 | 03 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,410 | $0 | Implemented |
AM0669 # 04 Y:2014 | 04 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $6,332 | $3,600 | Implemented |
AM0669 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,663 | $12,000 | Implemented |
AM0669 # 06 Y:2014 | 06 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,800 | $315 | Not Implemented |
AM0669 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,186 | $570 | Implemented |
AM0669 # 08 Y:2014 | 08 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $950 | $44 | Implemented |
WV0480 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,022 | $11,662 | Implemented |
WV0480 # 02 Y:2014 | 02 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,078 | $11,520 | Not Implemented |
WV0480 # 03 Y:2014 | 03 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,929 | $2,475 | Not Implemented |
WV0480 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,140 | $2,788 | Not Implemented |
WV0480 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,543 | $3,291 | Implemented |
WV0480 # 06 Y:2014 | 06 | 2014 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,967 | $1,000 | Implemented |
WV0480 # 07 Y:2014 | 07 | 2014 | OPTIMIZE PLANT POWER FACTOR | $2,869 | $13,803 | Not Implemented |
WV0480 # 08 Y:2014 | 08 | 2014 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $2,520 | $894 | Not Implemented |
WV0480 # 09 Y:2014 | 09 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,181 | $2,188 | Not Implemented |
WV0480 # 10 Y:2014 | 10 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,088 | $500 | Implemented |
WV0480 # 11 Y:2014 | 11 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $934 | $1,078 | Implemented |
WV0480 # 12 Y:2014 | 12 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $783 | $396 | Implemented |
LE0369 # 01 Y:2013 | 01 | 2013 | INSTALL OCCUPANCY SENSORS | $8,050 | $19,339 | Implemented |
LE0369 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,100 | $14,365 | Implemented |
LE0369 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,867 | $8,710 | Not Implemented |
LE0369 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,258 | $7,350 | Implemented |
LE0369 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $50,065 | $1,470 | Implemented |