Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
497
matching recommendationsNAICS | 33261 | Spring and Wire Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0978 # 06 Y:2017 | 06 | 2017 | USE OPTIMUM THICKNESS INSULATION | $86,982 | $91,480 | Not Implemented |
UD0978 # 05 Y:2017 | 05 | 2017 | ADD AREA LIGHTING SWITCHES | $2,220 | $180 | Not Implemented |
UD0978 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $79,415 | $79,850 | Not Implemented |
UD0978 # 03 Y:2017 | 03 | 2017 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,562 | $1,000 | Not Implemented |
UD0978 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,107 | $1,000 | Not Implemented |
UD0978 # 01 Y:2017 | 01 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,058 | $0 | Not Implemented |
IP0081 # 01 Y:2017 | 01 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,110 | $0 | Implemented |
IP0081 # 02 Y:2017 | 02 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,216 | $0 | Implemented |
IP0081 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $72 | $0 | Implemented |
IP0081 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,798 | $35 | Implemented |
IP0081 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,865 | $390 | Implemented |
IP0081 # 06 Y:2017 | 06 | 2017 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $25 | $17 | Not Implemented |
IP0081 # 07 Y:2017 | 07 | 2017 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $1,643 | $1,949 | Not Implemented |
IP0081 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $832 | $1,358 | Implemented |
IP0081 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $201 | $409 | Implemented |
IP0081 # 10 Y:2017 | 10 | 2017 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $1,766 | $3,788 | Not Implemented |
WV0540 # 01 Y:2017 | 01 | 2017 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $14,599 | $10,000 | Not Implemented |
WV0540 # 02 Y:2017 | 02 | 2017 | USE EVAPORATION TO CONCENTRATE MATERIAL | $11,734 | $40,000 | Not Implemented |
WV0540 # 03 Y:2017 | 03 | 2017 | INSULATE FEEDWATER TANK | $7,035 | $3,286 | Not Implemented |
WV0540 # 04 Y:2017 | 04 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $3,005 | $3,800 | Not Implemented |
WV0540 # 05 Y:2017 | 05 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $2,223 | $6,400 | Not Implemented |
WV0540 # 06 Y:2017 | 06 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $1,394 | $635 | Implemented |
WV0540 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,287 | $713 | Implemented |
WV0540 # 08 Y:2017 | 08 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,154 | $5,500 | Not Implemented |
WV0540 # 09 Y:2017 | 09 | 2017 | USE EVAPORATION TO CONCENTRATE MATERIAL | $883 | $3,150 | Not Implemented |