IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 332613 Spring Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0081 # 10 Y:2017 10 2017 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $1,766 $3,788 Not Implemented
IP0081 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $201 $409 Implemented
IP0081 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $832 $1,358 Implemented
IP0081 # 07 Y:2017 07 2017 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $1,643 $1,949 Not Implemented
IP0081 # 06 Y:2017 06 2017 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $25 $17 Not Implemented
IP0081 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,865 $390 Implemented
IP0081 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,798 $35 Implemented
IP0081 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $72 $0 Implemented
IP0081 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,216 $0 Implemented
IP0081 # 01 Y:2017 01 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,110 $0 Implemented
IC0107 # 12 Y:2005 12 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,508 $608 Not Implemented
IC0107 # 13 Y:2005 13 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,035 $4,016 Not Implemented
IC0107 # 01 Y:2005 01 2005 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $9,504 $19,598 Not Implemented
IC0107 # 11 Y:2005 11 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,097 $9,021 Not Implemented
IC0107 # 10 Y:2005 10 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,309 $0 Not Implemented
IC0107 # 09 Y:2005 09 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,560 $1,800 Not Implemented
IC0107 # 08 Y:2005 08 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $358 $262 Not Implemented
IC0107 # 07 Y:2005 07 2005 $799,427 $750,000 Not Implemented
IC0107 # 06 Y:2005 06 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,485 $224,000 Not Implemented
IC0107 # 05 Y:2005 05 2005 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $13,232 $0 Not Implemented
IC0107 # 04 Y:2005 04 2005 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $19,487 $61,560 Not Implemented
IC0107 # 03 Y:2005 03 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,772 $39,896 Not Implemented
IC0107 # 02 Y:2005 02 2005 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $93,103 $4,926 Not Implemented