IAC logo
IAC Assessment: IC0107
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0107
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2005
Principal Product Springs
NAICS 332613 - Spring Manufacturing
SIC 3495 - Wire Springs
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 500,000
Annual Production 0 Pieces
Production Hrs. Annual 8,520
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $273,684 7,179,200 kWh $0.04
Electricity Demand $90,776 15,856 kW-months/year $5.73
Electricity Fees $576 - $ -
Natural Gas $855,911 127,232 MMBtu $6.73
TOTAL ENERGY COSTS $1,220,947
RECOMMENDED SAVINGS* $977,877 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$9,504
Cost:
$19,598
$(-2,573) (-77,961) $(-613) (-107) $12,690 1,894 - - - - - - $(-2,573)
(-77,961)
kWh
$(-613)
(-107)
kW-months/year
$12,690
1,894
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT Savings:
$93,103
Cost:
$4,926
- - - - $93,103 13,896 - - - - - - -
-
kWh
-
-
kW-months/year
$93,103
13,896
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,772
Cost:
$39,896
- - - - $7,772 1,160 - - - - - - -
-
kWh
-
-
kW-months/year
$7,772
1,160
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$19,487
Cost:
$61,560
$(-4,025) (-121,967) $(-957) (-167) $24,469 3,652 - - - - - - $(-4,025)
(-121,967)
kWh
$(-957)
(-167)
kW-months/year
$24,469
3,652
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT Savings:
$13,232
Cost:
-
- - - - $13,232 1,975 - - - - - - -
-
kWh
-
-
kW-months/year
$13,232
1,975
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$22,485
Cost:
$224,000
- - - - $22,485 3,356 - - - - - - -
-
kWh
-
-
kW-months/year
$22,485
3,356
MMBtu
-
-
$
-
-
$
-
-
$
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$799,427
Cost:
$750,000
$(-3,291) (-99,715) $(-1,931) (-337) $(-14,573) (-2,175) - - - - $819,222 - $(-3,291)
(-99,715)
kWh
$(-1,931)
(-337)
kW-months/year
$(-14,573)
(-2,175)
MMBtu
-
-
$
-
-
$
$819,222
-
$
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$358
Cost:
$262
$358 10,858 - - - - - - - - - - $358
10,858
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,560
Cost:
$1,800
$3,652 110,598 $908 159 - - - - - - - - $3,652
110,598
kWh
$908
159
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,309
Cost:
-
$1,017 30,835 $292 51 - - - - - - - - $1,017
30,835
kWh
$292
51
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
11: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,097
Cost:
$9,021
$1,604 48,640 $493 86 - - - - - - - - $1,604
48,640
kWh
$493
86
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
12: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$3,508
Cost:
$608
$2,832 85,824 $676 118 - - - - - - - - $2,832
85,824
kWh
$676
118
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,035
Cost:
$4,016
$506 15,336 $126 22 - - $88 - $315 - - - $506
15,336
kWh
$126
22
kW-months/year
-
-
MMBtu
$88
-
$
$315
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$977,877
Cost:
$1,115,687
$80 2,448 $(-1,006) (-175) $159,178 23,758 $88 - $315 - $819,222 - $80
2,448
kWh
$(-1,006)
(-175)
kW-months/year
$159,178
23,758
MMBtu
$88
-
$
$315
-
$
$819,222
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product