IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

327

matching recommendations
Reset
NAICS 332618 Other Fabricated Wire Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0821 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,375 $1,700 Implemented
OK0821 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,301 $0 Implemented
OK0821 # 09 Y:2012 09 2012 REPLACE BOILER $21,929 $26,400 Not Implemented
OK0821 # 10 Y:2012 10 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $2,699 $3,135 Not Implemented
OK0821 # 11 Y:2012 11 2012 OPTIMIZE PLANT POWER FACTOR $19,001 $9,750 Not Implemented
BD0395 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,465 $34,827 Implemented
BD0395 # 02 Y:2011 02 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,656 $2,150 Not Implemented
BD0395 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $1,621 $825 Implemented
BD0395 # 04 Y:2011 04 2011 USE RADIANT HEATER FOR SPOT HEATING $1,380 $1,500 Not Implemented
BD0395 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $888 $1,000 Not Implemented
BD0395 # 06 Y:2011 06 2011 USE PHOTOCELL CONTROLS $615 $375 Implemented
LE0277 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,555 $1,000 Not Implemented
LE0277 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,354 $15,000 Not Implemented
LE0277 # 03 Y:2008 03 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,444 $500 Not Implemented
LE0277 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,656 $130 Not Implemented
LE0277 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,432 $200 Not Implemented
LE0277 # 06 Y:2008 06 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,194 $2,500 Not Implemented
LE0277 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $884 $800 Not Implemented
LE0277 # 08 Y:2008 08 2008 USE SOLAR HEAT TO HEAT WATER $354 $1,260 Not Implemented
LE0277 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,555 $3,555 Not Implemented
LE0277 # 10 Y:2008 10 2008 INSTALL OCCUPANCY SENSORS $755 $60 Not Implemented
LL0281 # 01 Y:2007 01 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,512 $735 Implemented
LL0281 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $9,842 $1,585 Implemented
LL0281 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,804 $2,400 Implemented
LL0281 # 04 Y:2007 04 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $5,988 $120 Implemented