Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
142
matching recommendationsNAICS | 33272 | Turned Product and Screw, Nut, and Bolt Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0320 # 14 Y:2025 | 14 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,451 | $2,683 | n/a |
IC0320 # 10 Y:2025 | 10 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,014 | $0 | n/a |
IC0320 # 15 Y:2025 | 15 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $23,186 | $8,172 | n/a |
IC0320 # 09 Y:2025 | 09 | 2025 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $14,144 | $4,260 | n/a |
IC0320 # 08 Y:2025 | 08 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,028 | $18,900 | n/a |
IC0320 # 13 Y:2025 | 13 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,293 | $0 | n/a |
IC0320 # 12 Y:2025 | 12 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,662 | $5,368 | n/a |
IC0320 # 11 Y:2025 | 11 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $13,402 | $89,603 | n/a |
IC0320 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,890 | $4,339 | n/a |
IC0320 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $3,180 | $603 | n/a |
IC0320 # 05 Y:2025 | 05 | 2025 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $20,912 | $135,826 | n/a |
IC0320 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $709 | $288 | n/a |
IC0320 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $373 | $0 | n/a |
IC0320 # 02 Y:2025 | 02 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $349 | $768 | n/a |
IC0320 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $101,385 | $489,315 | n/a |
MU0054 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,874 | $0 | n/a |
MU0054 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,296 | $0 | n/a |
MU0054 # 07 Y:2024 | 07 | 2024 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $349 | $0 | n/a |
MU0054 # 06 Y:2024 | 06 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $118 | $272 | n/a |
MU0054 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,402 | $28,100 | n/a |
MU0054 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,876 | $1,801 | n/a |
MU0054 # 01 Y:2024 | 01 | 2024 | USE OPTIMUM TEMPERATURE | $6,955 | $0 | n/a |
DL0235 # 06 Y:2024 | 06 | 2024 | REDUCE VENTILATION AIR | $1,085 | $0 | Not Implemented |
DL0235 # 05 Y:2024 | 05 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $646 | $3,000 | Not Implemented |
DL0235 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $24,674 | $10,000 | Implemented |