IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
NAICS 3328 Coating, Engraving, Heat Treating, and Allied Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0251 # 10 Y:2021 10 2021 INSULATE BARE EQUIPMENT $2,602 $297 Not Implemented
TT0251 # 09 Y:2021 09 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,884 $40 Not Implemented
TT0251 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,374 $15,800 Not Implemented
TT0251 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,136 $35,365 Not Implemented
TT0251 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,965 $15,800 Not Implemented
TT0251 # 11 Y:2021 11 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,308 $150 Not Implemented
TT0251 # 05 Y:2021 05 2021 UPGRADE CONTROLS ON COMPRESSORS $9,683 $250 Not Implemented
TT0251 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,814 $2,000 Not Implemented
TT0251 # 03 Y:2021 03 2021 ADOPT IN-HOUSE MATERIAL GENERATION $42,490 $112,956 Not Implemented
TT0251 # 02 Y:2021 02 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $56,927 $200 Not Implemented
TT0251 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $95,933 $4,500 Not Implemented
TT0177 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $663 $150 Implemented
TT0177 # 09 Y:2016 09 2016 INSTALL TIMERS AND/OR THERMOSTATS $108 $23 Not Implemented
TT0177 # 08 Y:2016 08 2016 USE COMPRESSOR AIR FILTERS $338 $75 Implemented
TT0177 # 06 Y:2016 06 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,002 $1,400 Implemented
TT0177 # 05 Y:2016 05 2016 OPTIMIZE PLANT POWER FACTOR $1,603 $5,250 Not Implemented
TT0177 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $2,669 $1,720 Not Implemented
TT0177 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $4,803 $500 Not Implemented
TT0177 # 02 Y:2016 02 2016 UPGRADE CONTROLS ON COMPRESSORS $6,467 $250 Not Implemented
TT0177 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,244 $15,800 Not Implemented
TT0151 # 02 Y:2015 02 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $13,548 $21,700 Not Implemented
TT0151 # 01 Y:2015 01 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,852 $30,000 Not Implemented
TT0151 # 03 Y:2015 03 2015 OPTIMIZE PLANT POWER FACTOR $11,094 $20,000 Not Implemented
TT0151 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $1,197 $600 Not Implemented
TT0151 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $2,096 $600 Not Implemented