Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
160
matching recommendationsNAICS | 3328 | Coating, Engraving, Heat Treating, and Allied Activities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0382 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $595 | $100 | n/a |
MZ0382 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,303 | $4,500 | n/a |
MZ0382 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $179 | $1,000 | n/a |
MZ0382 # 04 Y:2025 | 04 | 2025 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $149,231 | $825,000 | n/a |
TT0336 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $551 | $375 | n/a |
TT0336 # 01 Y:2025 | 01 | 2025 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $21,145 | $30,000 | n/a |
TT0336 # 10 Y:2025 | 10 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $507 | $100 | n/a |
TT0336 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $19,703 | $159,000 | n/a |
TT0336 # 08 Y:2025 | 08 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $572 | $60 | n/a |
TT0336 # 03 Y:2025 | 03 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,640 | $6,680 | n/a |
TT0336 # 06 Y:2025 | 06 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,830 | $500 | n/a |
TT0336 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $2,201 | $5,250 | n/a |
TT0336 # 12 Y:2025 | 12 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $153 | $255 | n/a |
TT0336 # 11 Y:2025 | 11 | 2025 | INSTALL OCCUPANCY SENSORS | $355 | $1,600 | n/a |
TT0336 # 04 Y:2025 | 04 | 2025 | BURN A LESS EXPENSIVE GRADE OF FUEL | $6,724 | $40,000 | n/a |
TT0336 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,078 | $400 | n/a |
IP0213 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,151 | $26,250 | n/a |
IP0213 # 07 Y:2025 | 07 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $825 | $340 | n/a |
IP0213 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $40,943 | $4,528 | n/a |
IP0213 # 06 Y:2025 | 06 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $9,346 | $3,710 | n/a |
IP0213 # 10 Y:2025 | 10 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,498 | $13,433 | n/a |
IP0213 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,374 | $270 | n/a |
IP0213 # 08 Y:2025 | 08 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $48,428 | $56,200 | n/a |
IP0213 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $953 | $280 | n/a |
IP0213 # 01 Y:2025 | 01 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,494 | $0 | n/a |