IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
NAICS 332813 Electroplating, Plating, Polishing, Anodizing, and Coloring
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0707 # 09 Y:2004 09 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $272 $750 Not Implemented
UD0707 # 08 Y:2004 08 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $827 $1,000 Not Implemented
UD0707 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $1,158 $245 Implemented
UD0707 # 06 Y:2004 06 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,078 $15,000 Not Implemented
UD0707 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,960 $0 Not Implemented
UD0707 # 04 Y:2004 04 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,671 $46,000 Not Implemented
UD0707 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,956 $31,342 Implemented
UD0707 # 02 Y:2004 02 2004 COVER OPEN TANKS $27,270 $4,326 Implemented
UD0707 # 01 Y:2004 01 2004 CHECK FOR ACCURACY OF UTILITY / POWER METERS $63,251 $782 Not Implemented
LM0081 # 07 Y:2004 07 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,611 $1,814 Not Implemented
LM0081 # 06 Y:2004 06 2004 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $292,248 $4,925 Not Implemented
LM0081 # 05 Y:2004 05 2004 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $233,065 $1,000 Not Implemented
LM0081 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $160 $80 Not Implemented
LM0081 # 03 Y:2004 03 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $85 $0 Not Implemented
LM0081 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,857 $300 Implemented
LM0081 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,802 $0 Not Implemented
MA0558 # 04 Y:2004 04 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $12,494 $4,680 Implemented
MA0558 # 03 Y:2004 03 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $12,830 $5,000 Implemented
MA0558 # 01 Y:2004 01 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $28,200 $4,500 Implemented
MA0558 # 06 Y:2004 06 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,912 $0 Implemented
MA0558 # 05 Y:2004 05 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,990 $0 Not Implemented
MA0558 # 02 Y:2004 02 2004 USE MINIMUM STEAM OPERATING PRESSURE $19,575 $1,000 Not Implemented
MA0558 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $2,965 $2,690 Implemented
MA0558 # 08 Y:2004 08 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $979 $240 Not Implemented
MA0557 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $1,340 Implemented