IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,304

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0140 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,837 $642 Implemented
BS0140 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,475 $2,808 Not Implemented
BS0140 # 06 Y:2020 06 2020 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $479 $1,149 Not Implemented
LE0497 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,793 $4,200 Not Implemented
LE0497 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $13,727 $10,000 Not Implemented
LE0497 # 03 Y:2020 03 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,231 $32,000 Not Implemented
LE0497 # 04 Y:2020 04 2020 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $2,905 $5,000 Not Implemented
LE0497 # 05 Y:2020 05 2020 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,765 $4,600 Not Implemented
LE0497 # 06 Y:2020 06 2020 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,520 $13,000 Not Implemented
CL2009 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,388 $1,300 Implemented
CL2009 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,350 $1,650 Implemented
CL2009 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,213 $0 Not Implemented
CL2009 # 04 Y:2020 04 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $9,407 $23,157 Implemented
MZ0286 # 01 Y:2020 01 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,656 $8,200 Not Implemented
MZ0286 # 02 Y:2020 02 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,624 $9,088 Implemented
MZ0286 # 03 Y:2020 03 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,749 $480 Not Implemented
MZ0286 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,970 $2,000 Implemented
MZ0286 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,616 $13,442 Not Implemented
MZ0286 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $118 $200 Not Implemented
MZ0286 # 07 Y:2020 07 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $238 $40 Not Implemented
LE0496 # 01 Y:2020 01 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $30,000 $0 Not Implemented
LE0496 # 02 Y:2020 02 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,682 $0 Not Implemented
LE0496 # 03 Y:2020 03 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,482 $3,000 Not Implemented
LE0496 # 04 Y:2020 04 2020 RECOVER WASTE HEAT FROM EQUIPMENT $3,545 $5,000 Not Implemented
LE0496 # 05 Y:2020 05 2020 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $1,393 $3,150 Not Implemented