IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,271

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0802 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,512 $2,280 Implemented
AM0802 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,175 $1,200 Implemented
AM0802 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $540 $25 Not Implemented
MZ0287 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,540 $2,484 Implemented
MZ0287 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,461 $1,310 Implemented
MZ0287 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,049 $14,550 Implemented
MZ0287 # 04 Y:2020 04 2020 USE RADIANT HEATER FOR SPOT HEATING $4,983 $6,696 Implemented
MZ0287 # 05 Y:2020 05 2020 RECOVER WASTE HEAT FROM EQUIPMENT $2,939 $356 Implemented
MZ0287 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $2,755 $5,978 Implemented
MZ0287 # 07 Y:2020 07 2020 OPTIMIZE PLANT POWER FACTOR $937 $4,000 Implemented
MZ0287 # 08 Y:2020 08 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $638 $1,220 Not Implemented
MZ0287 # 09 Y:2020 09 2020 USE PHOTOCELL CONTROLS $579 $847 Not Implemented
IC0235 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,357 $32,486 Not Implemented
IC0235 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $1,398 $3,402 Not Implemented
IC0235 # 03 Y:2020 03 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,555 $1,224 Not Implemented
IC0235 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,628 $0 Not Implemented
TR0022 # 01 Y:2020 01 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,078 $0 Not Implemented
TR0022 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,125 $1,000 Implemented
TR0022 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,666 $10,056 Implemented
TR0022 # 04 Y:2020 04 2020 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $204 $102 Implemented
TR0022 # 05 Y:2020 05 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,951 $15,000 Not Implemented
TR0022 # 06 Y:2020 06 2020 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,628 $0 Implemented
WM0145 # 01 Y:2019 01 2019 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $29,234 $3,500 Not Implemented
WM0145 # 02 Y:2019 02 2019 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING $10,866 $8,300 Not Implemented
WM0145 # 03 Y:2019 03 2019 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $7,173 $2,200 Not Implemented