Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
2,355
matching recommendationsNAICS | 3329 | Other Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0140 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,058 | $0 | Implemented |
BS0140 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,837 | $642 | Implemented |
BS0140 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,475 | $2,808 | Not Implemented |
BS0140 # 06 Y:2020 | 06 | 2020 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $479 | $1,149 | Not Implemented |
LE0497 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,793 | $4,200 | Not Implemented |
LE0497 # 02 Y:2020 | 02 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $13,727 | $10,000 | Not Implemented |
LE0497 # 03 Y:2020 | 03 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $21,231 | $32,000 | Not Implemented |
LE0497 # 04 Y:2020 | 04 | 2020 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $2,905 | $5,000 | Not Implemented |
LE0497 # 05 Y:2020 | 05 | 2020 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $1,765 | $4,600 | Not Implemented |
LE0497 # 06 Y:2020 | 06 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $3,520 | $13,000 | Not Implemented |
CL2009 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,388 | $1,300 | Implemented |
CL2009 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,350 | $1,650 | Implemented |
CL2009 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,213 | $0 | Not Implemented |
CL2009 # 04 Y:2020 | 04 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $9,407 | $23,157 | Implemented |
MZ0286 # 01 Y:2020 | 01 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,656 | $8,200 | Not Implemented |
MZ0286 # 02 Y:2020 | 02 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,624 | $9,088 | Implemented |
MZ0286 # 03 Y:2020 | 03 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,749 | $480 | Not Implemented |
MZ0286 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,970 | $2,000 | Implemented |
MZ0286 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,616 | $13,442 | Not Implemented |
MZ0286 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $118 | $200 | Not Implemented |
MZ0286 # 07 Y:2020 | 07 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $238 | $40 | Not Implemented |
LE0496 # 01 Y:2020 | 01 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $30,000 | $0 | Not Implemented |
LE0496 # 02 Y:2020 | 02 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,682 | $0 | Not Implemented |
LE0496 # 03 Y:2020 | 03 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,482 | $3,000 | Not Implemented |
LE0496 # 04 Y:2020 | 04 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,545 | $5,000 | Not Implemented |