Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12
matching recommendationsNAICS | 3329 | Other Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0902 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,435 | $6,000 | Not Implemented |
GT0902 # 02 Y:2017 | 02 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $19,872 | $6,000 | Not Implemented |
GT0902 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $50 | $197 | Implemented |
GT0877 # 01 Y:2010 | 01 | 2010 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $392,100 | $250,000 | Not Implemented |
GT0874 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,133 | $1,250 | Implemented |
GT0874 # 02 Y:2010 | 02 | 2010 | USE SYNTHETIC LUBRICANT | $1,632 | $0 | Not Implemented |
GT0874 # 03 Y:2010 | 03 | 2010 | USE OPTIMUM THICKNESS INSULATION | $53,185 | $6,187 | Not Implemented |
GT0874 # 04 Y:2010 | 04 | 2010 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,159 | $2,883 | Implemented |
GT0874 # 05 Y:2010 | 05 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $19,038 | $20,250 | Not Implemented |
GT0874 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,115 | $38,366 | Not Implemented |
GT0874 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,744 | $119,989 | Implemented |
GT0874 # 08 Y:2010 | 08 | 2010 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $392,100 | $177,900 | Not Implemented |