Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
128
matching recommendationsNAICS | 3329 | Other Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2504 # 01 Y:2025 | 01 | 2025 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $3,510 | $0 | n/a |
LS2504 # 05 Y:2025 | 05 | 2025 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $104,805 | $23,000 | n/a |
LS2504 # 09 Y:2025 | 09 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,467 | $37,172 | n/a |
LS2504 # 10 Y:2025 | 10 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,299 | $483,600 | n/a |
LS2504 # 06 Y:2025 | 06 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $83,111 | $240,915 | n/a |
LS2504 # 04 Y:2025 | 04 | 2025 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,184 | $241 | n/a |
LS2504 # 02 Y:2025 | 02 | 2025 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $3,440 | $35 | n/a |
LS2504 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $9,938 | $200 | n/a |
LS2504 # 07 Y:2025 | 07 | 2025 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $6,500 | $20,000 | n/a |
LS2504 # 08 Y:2025 | 08 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $113,606 | $398,500 | n/a |
LS2502 # 01 Y:2025 | 01 | 2025 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $8,066 | $0 | n/a |
LS2502 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,783 | $6,965 | n/a |
LS2502 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,792 | $100 | n/a |
LS2502 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $6,307 | $300 | n/a |
LS2502 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $905 | $45 | n/a |
LS2404 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,458 | $11,138 | Implemented |
LS2404 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,054 | $135 | Implemented |
LS2404 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,008 | $75 | Not Implemented |
LS2404 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,771 | $3,080 | Implemented |
LS2404 # 01 Y:2024 | 01 | 2024 | INSTALL OCCUPANCY SENSORS | $5,988 | $275 | Implemented |
LT8370 # 03 Y:2023 | 03 | 2023 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $24,363 | $0 | Implemented |
LT8370 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $11,372 | $1,800 | Implemented |
LT8370 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,864 | $8,022 | Not Implemented |
LT8370 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,034 | $0 | Implemented |
LS1916 # 09 Y:2019 | 09 | 2019 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $369 | $500 | Not Implemented |