Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
174
matching recommendationsNAICS | 3329 | Other Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0292 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,782 | $480 | Implemented |
UM0292 # 02 Y:2005 | 02 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,368 | $5,000 | Implemented |
UM0292 # 04 Y:2005 | 04 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,943 | $50 | Implemented |
UM0292 # 05 Y:2005 | 05 | 2005 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $1,193 | $3,000 | Not Implemented |
UM0292 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,731 | $23,005 | Not Implemented |
UM0292 # 06 Y:2005 | 06 | 2005 | INSTALL OCCUPANCY SENSORS | $821 | $368 | Not Implemented |
WI0500 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,252 | $2,032 | n/a |
WI0500 # 04 Y:2005 | 04 | 2005 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $5,380 | $0 | n/a |
WI0500 # 01 Y:2005 | 01 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $57,577 | $25,000 | n/a |
WI0500 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,522 | $640 | n/a |
WI0500 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,617 | $52,200 | n/a |
WI0500 # 07 Y:2005 | 07 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,092 | $208 | n/a |
WI0500 # 05 Y:2005 | 05 | 2005 | IMPROVE LUBRICATION PRACTICES | $4,137 | $4,810 | n/a |
MI0117 # 01 Y:2005 | 01 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $16,898 | $1,350 | Implemented |
MI0117 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,621 | $56 | Not Implemented |
MI0117 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,012 | $906 | Implemented |
MI0117 # 02 Y:2005 | 02 | 2005 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $4,463 | $11,400 | Implemented |
MI0117 # 05 Y:2005 | 05 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,044 | $5,024 | Not Implemented |
TA0100 # 07 Y:2005 | 07 | 2005 | INSULATE BARE EQUIPMENT | $1,530 | $570 | Implemented |
TA0100 # 08 Y:2005 | 08 | 2005 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $850 | $0 | Implemented |
TA0100 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $500 | $0 | Implemented |
TA0100 # 01 Y:2005 | 01 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $136,425 | $38,485 | Not Implemented |
TA0100 # 02 Y:2005 | 02 | 2005 | INSULATE BARE EQUIPMENT | $15,690 | $1,015 | Implemented |
TA0100 # 03 Y:2005 | 03 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,111 | $7,705 | Not Implemented |
TA0100 # 04 Y:2005 | 04 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,280 | $1,485 | Not Implemented |