IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

762

matching recommendations
Reset
NAICS 33291 Metal Valve Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0604 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,100 $33,600 Implemented
AM0604 # 02 Y:2012 02 2012 OPTIMIZE PLANT POWER FACTOR $5,450 $18,900 Not Implemented
AM0604 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,375 $2,490 Implemented
AM0604 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $960 $440 Not Implemented
AM0604 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $850 $381 Implemented
AM0604 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $605 $0 Implemented
AM0604 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $280 $381 Implemented
AM0604 # 08 Y:2012 08 2012 PAY UTILITY BILLS ON TIME $675 $0 Not Implemented
SD0442 # 01 Y:2011 01 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $727 $100 Not Implemented
SD0442 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,100 $100 Not Implemented
SD0442 # 03 Y:2011 03 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $247 $30 Not Implemented
SD0442 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,022 $1,900 Not Implemented
SD0442 # 05 Y:2011 05 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,760 $26,500 Not Implemented
SD0442 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $597 $1,566 Not Implemented
LL0348 # 01 Y:2011 01 2011 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $102,711 $10,348 Implemented
LL0348 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,376 $12,200 Implemented
LL0348 # 03 Y:2011 03 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,789 $5,670 Implemented
LL0348 # 04 Y:2011 04 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $935 $1,838 Not Implemented
LL0348 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $605 $4,020 Implemented
LL0348 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $366 $3,220 Implemented
LL0348 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $145 $356 Implemented
LL0348 # 08 Y:2011 08 2011 INSULATE BARE EQUIPMENT $35 $56 Implemented
WV0423 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,866 $52,636 Not Implemented
WV0423 # 02 Y:2011 02 2011 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,406 $12,655 Not Implemented
WV0423 # 03 Y:2011 03 2011 DEVELOP A REPAIR/REPLACE POLICY $1,913 $1,429 Not Implemented