IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

762

matching recommendations
Reset
NAICS 33291 Metal Valve Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT8370 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,372 $1,800 n/a
MZ0326 # 12 Y:2022 12 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,151 $600 Not Implemented
MZ0326 # 11 Y:2022 11 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $384,733 $2,868,753 Implemented
MZ0326 # 10 Y:2022 10 2022 INSTALL SPECTRAL REFLECTORS / DELAMP $1,954 $1,170 Not Implemented
MZ0326 # 09 Y:2022 09 2022 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $10,442 $18,650 Not Implemented
MZ0326 # 08 Y:2022 08 2022 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $116,541 $552,315 Not Implemented
MZ0326 # 07 Y:2022 07 2022 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $597 $580 Implemented
MZ0326 # 06 Y:2022 06 2022 OPTIMIZE PLANT POWER FACTOR $1,106 $2,244 Implemented
MZ0326 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,930 $12,076 Implemented
MZ0326 # 04 Y:2022 04 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $874 $140 Not Implemented
MZ0326 # 03 Y:2022 03 2022 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,085 $144 Implemented
MZ0326 # 02 Y:2022 02 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,611 $4,700 Not Implemented
MZ0326 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,449 $3,200 Implemented
TT0276 # 01 Y:2022 01 2022 ADOPT IN-HOUSE MATERIAL GENERATION $42,153 $40,000 Not Implemented
TT0276 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $125,911 $145,300 Not Implemented
TT0276 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $37,334 $25,000 Not Implemented
TT0276 # 04 Y:2022 04 2022 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $35,279 $40,000 Not Implemented
TT0276 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $22,303 $60 Implemented
TT0276 # 06 Y:2022 06 2022 OPTIMIZE PLANT POWER FACTOR $16,112 $15,000 Not Implemented
TT0276 # 07 Y:2022 07 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,657 $3,175 Implemented
TT0276 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,344 $24,750 Implemented
TT0276 # 09 Y:2022 09 2022 CHANGE OPERATING CONDITIONS $6,750 $2,000 Implemented
TT0276 # 10 Y:2022 10 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,766 $40 Not Implemented
TT0276 # 11 Y:2022 11 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,311 $2,240 Not Implemented
TT0276 # 12 Y:2022 12 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,455 $6,840 Not Implemented