Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
NAICS 33291 Metal Valve Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1106 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $149 $0 Not Implemented
OK1106 # 06 Y:2024 06 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $122 $602 Not Implemented
OK1106 # 05 Y:2024 05 2024 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,777 $4,495 Implemented
OK1106 # 04 Y:2024 04 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,650 $8,580 Not Implemented
OK1106 # 03 Y:2024 03 2024 USE RADIANT HEATER FOR SPOT HEATING $2,649 $5,850 Not Implemented
OK1106 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $40,554 $187,200 Not Implemented
OK1106 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,422 $50,026 Implemented
OK0852 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,138 $17,292 Not Implemented
OK0852 # 01 Y:2013 01 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,621 $2,310 Implemented
OK0852 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,456 $0 Not Implemented
OK0852 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,590 $2,756 Not Implemented
OK0852 # 11 Y:2013 11 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,792 $550 Implemented
OK0852 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $838 $3,718 Implemented
OK0852 # 07 Y:2013 07 2013 INSTALL SET-BACK TIMERS $1,467 $1,038 Not Implemented
OK0852 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,935 $10,793 Not Implemented
OK0852 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $497 $1,388 Implemented
OK0852 # 06 Y:2013 06 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,139 $344 Implemented
OK0852 # 05 Y:2013 05 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,781 $1,440 Not Implemented
OK0795 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,260 $159,982 Not Implemented
OK0795 # 07 Y:2010 07 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $896 $5,000 Implemented
OK0795 # 08 Y:2010 08 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,751 $1,680 Implemented
OK0795 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,244 $11,715 Not Implemented
OK0795 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,677 $1,100 Implemented
OK0795 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,567 $513 Not Implemented
OK0795 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $8,321 $4,015 Not Implemented