Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
66
matching recommendationsNAICS | 33299 | All Other Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0340 # 01 Y:2010 | 01 | 2010 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $13,551 | $1,457 | Implemented |
LL0340 # 02 Y:2010 | 02 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $13,537 | $450 | Not Implemented |
LL0340 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,760 | $1,600 | Implemented |
LL0340 # 07 Y:2010 | 07 | 2010 | INSTALL OCCUPANCY SENSORS | $895 | $1,080 | Not Implemented |
LL0340 # 09 Y:2010 | 09 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $356 | $425 | Implemented |
LL0340 # 10 Y:2010 | 10 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $225 | $312 | Not Implemented |
LL0340 # 08 Y:2010 | 08 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $466 | $315 | Not Implemented |
LL0340 # 04 Y:2010 | 04 | 2010 | USE PHOTOCELL CONTROLS | $4,851 | $210 | Implemented |
LL0340 # 05 Y:2010 | 05 | 2010 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $4,310 | $420 | Implemented |
LL0340 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,383 | $8 | Implemented |
GT0877 # 01 Y:2010 | 01 | 2010 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $392,100 | $250,000 | Not Implemented |
UM0373 # 03 Y:2010 | 03 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,127 | $4,000 | Not Implemented |
UM0373 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,156 | $44,196 | Not Implemented |
UM0373 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,961 | $200 | Not Implemented |
UM0373 # 06 Y:2010 | 06 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,651 | $6,300 | Not Implemented |
UM0373 # 05 Y:2010 | 05 | 2010 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $5,428 | $1,040 | Not Implemented |
UM0373 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $870 | $828 | Not Implemented |
GT0874 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,133 | $1,250 | Implemented |
GT0874 # 08 Y:2010 | 08 | 2010 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $392,100 | $177,900 | Not Implemented |
GT0874 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,744 | $119,989 | Implemented |
GT0874 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,115 | $38,366 | Not Implemented |
GT0874 # 05 Y:2010 | 05 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $19,038 | $20,250 | Not Implemented |
GT0874 # 04 Y:2010 | 04 | 2010 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,159 | $2,883 | Implemented |
GT0874 # 03 Y:2010 | 03 | 2010 | USE OPTIMUM THICKNESS INSULATION | $53,185 | $6,187 | Not Implemented |
GT0874 # 02 Y:2010 | 02 | 2010 | USE SYNTHETIC LUBRICANT | $1,632 | $0 | Not Implemented |