IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
NAICS 332992 Small Arms Ammunition Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0184 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $546 $550 Not Implemented
UU0184 # 05 Y:2021 05 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $731 $2,000 Not Implemented
UU0184 # 04 Y:2021 04 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $1,530 $500 Not Implemented
UU0184 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $2,375 $6,744 Not Implemented
UU0184 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,459 $2,700 Not Implemented
UU0184 # 01 Y:2021 01 2021 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $26,453 $92,586 Implemented
AM0738 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,030 $41,200 Implemented
AM0738 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $23,860 $39,900 Implemented
AM0738 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,870 $3,000 Implemented
AM0738 # 04 Y:2017 04 2017 INCREASE AMOUNT OF CONDENSATE RETURNED $10,870 $19,400 Implemented
AM0738 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $10,990 $9,760 Implemented
SU0382 # 08 Y:2015 08 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $68 $324 Not Implemented
SU0382 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $394 $1,415 Not Implemented
SU0382 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $461 $1,590 Not Implemented
SU0382 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $220 $624 Not Implemented
SU0382 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,679 $10,400 Not Implemented
SU0382 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $394 $320 Not Implemented
SU0382 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,982 $1,901 Not Implemented
SU0382 # 01 Y:2015 01 2015 USE SYNTHETIC LUBRICANT $362 $0 Not Implemented
BS0048 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,240 $1,650 Not Implemented
BS0048 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,298 $28,509 Implemented
BS0048 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,926 $9,550 Implemented
BS0048 # 10 Y:2015 10 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $305 $20 Not Implemented
BS0048 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $406 $722 Implemented
BS0048 # 08 Y:2015 08 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $168 $805 Implemented