IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 332993 Ammunition (except Small Arms) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0439 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,023 $105,761 Not Implemented
LE0439 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,903 $21,654 Implemented
LE0439 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,992 $5,000 Implemented
LE0439 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,559 $4,244 Not Implemented
LE0439 # 04 Y:2017 04 2017 TREAT AND REUSE RINSE WATERS $35,049 $30,000 Not Implemented
LE0439 # 03 Y:2017 03 2017 USE RADIANT HEATER FOR SPOT HEATING $17,188 $9,084 Not Implemented
LE0439 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,477 $600 Implemented
LE0439 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,940 $750 Not Implemented
LE0366 # 12 Y:2013 12 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $13,454 $60,000 Not Implemented
LE0366 # 15 Y:2013 15 2013 INSTALL TIMERS AND/OR THERMOSTATS $1,242 $2,400 Not Implemented
LE0366 # 14 Y:2013 14 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,188 $11,909 Not Implemented
LE0366 # 13 Y:2013 13 2013 MOVE BOILER TO MORE EFFICIENT LOCATION $721 $2,000 Not Implemented
LE0366 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $264,361 $119,173 Not Implemented
LE0366 # 11 Y:2013 11 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $17,390 $6,750 Not Implemented
LE0366 # 10 Y:2013 10 2013 REPAIR AND ELIMINATE STEAM LEAKS $51,910 $52,314 Not Implemented
LE0366 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,762 $6,498 Not Implemented
LE0366 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,664 $1,000 Not Implemented
LE0366 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,595 $169,520 Not Implemented
LE0366 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,758 $10,000 Not Implemented
LE0366 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $92,173 $61,200 Not Implemented
LE0366 # 04 Y:2013 04 2013 ELIMINATE/REDUCE AN OPERATION $13,661 $0 Not Implemented
LE0366 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $2,504 $1,586 Not Implemented
LE0366 # 02 Y:2013 02 2013 USE OPTIMUM THICKNESS INSULATION $45,077 $26,012 Not Implemented