IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

897

matching recommendations
Reset
NAICS 332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1507 # 10 Y:2015 10 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $573 $420 Not Implemented
UK1507 # 11 Y:2015 11 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $217 $570 Not Implemented
UK1507 # 12 Y:2015 12 2015 DEVELOP A REPAIR/REPLACE POLICY $3,131 $1,576 Not Implemented
UK1507 # 13 Y:2015 13 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $660 $0 Implemented
UK1507 # 14 Y:2015 14 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $354 $0 Not Implemented
UK1507 # 15 Y:2015 15 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,875 $1,500 Not Implemented
UK1507 # 16 Y:2015 16 2015 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,962 $7,200 Not Implemented
UK1507 # 17 Y:2015 17 2015 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,283 $4,078 Not Implemented
UK1507 # 18 Y:2015 18 2015 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,118 $996 Not Implemented
UK1507 # 19 Y:2015 19 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,614 $3,000 Not Implemented
UD0927 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,206 $1,000 Not Implemented
UD0927 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,025 $0 Implemented
UD0927 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,022 $300 Implemented
UD0927 # 04 Y:2015 04 2015 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $11,905 $0 Not Implemented
UD0927 # 05 Y:2015 05 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,750 $3,000 Not Implemented
UD0927 # 06 Y:2015 06 2015 COMBINE UTILITY METERS $63,547 $50,000 Not Implemented
UD0927 # 07 Y:2015 07 2015 CONTRACT A WOOD PALLET RECYCLING COMPANY $11,280 $0 Not Implemented
AM0684 # 01 Y:2015 01 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $24,700 $0 Not Implemented
AM0684 # 02 Y:2015 02 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,370 $0 Not Implemented
AM0684 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,080 $2,200 Not Implemented
AM0684 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,800 $6,740 Not Implemented
AM0684 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,410 $11 Not Implemented
AM0684 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $476 $1,545 Not Implemented
OK0906 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,040 $1,751 Not Implemented
OK0906 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,273 $600 Implemented