IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

364

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0411 # 13 Y:2008 13 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $110,982 $0 Implemented
MI0148 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,440 $1,074 Not Implemented
MI0148 # 01 Y:2007 01 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,264 $915 Not Implemented
MI0148 # 02 Y:2007 02 2007 DISCONNECT BALLASTS $5,169 $2,150 Not Implemented
MI0148 # 03 Y:2007 03 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,272 $10,200 Not Implemented
MI0148 # 04 Y:2007 04 2007 INSTALL SKYLIGHTS $5,197 $16,736 Not Implemented
MI0148 # 06 Y:2007 06 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,961 $3,010 Not Implemented
MI0148 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,128 $1,423 Not Implemented
MI0148 # 08 Y:2007 08 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $452 $160 Not Implemented
UF0399 # 01 Y:2007 01 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,373 $24,800 Not Implemented
UF0399 # 02 Y:2007 02 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $349 $1,376 Not Implemented
UF0399 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,878 $437 Implemented
UF0399 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,852 $0 Implemented
UF0399 # 05 Y:2007 05 2007 USE OPTIMUM THICKNESS INSULATION $1,157 $188 Not Implemented
UF0399 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $939 $0 Not Implemented
UF0399 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,311 $44,692 Not Implemented
UF0399 # 08 Y:2007 08 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $47,277 $35,000 Not Implemented
UF0399 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,017 $1,719 Not Implemented
UF0399 # 10 Y:2007 10 2007 INSTALL OCCUPANCY SENSORS $1,761 $404 Implemented
UF0399 # 11 Y:2007 11 2007 RECYCLE FLUORESCENT LAMPS $1,005 $3,486 Implemented
UF0399 # 12 Y:2007 12 2007 CHANGE OPERATING CONDITIONS $74,852 $731 Implemented
UF0390 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $148,376 $619,757 Not Implemented
UF0390 # 12 Y:2006 12 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,655 $1,610 Not Implemented
UF0390 # 03 Y:2006 03 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $87,992 $39,000 Not Implemented
UF0390 # 04 Y:2006 04 2006 AIR CONDITION ONLY SPACE NECESSARY $41,661 $1,080 Not Implemented