IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,510

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1086 # 08 Y:2024 08 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,780 $0 Not Implemented
UD1086 # 09 Y:2024 09 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,459 $7,620 Not Implemented
UD1086 # 10 Y:2024 10 2024 OPTIMIZE PLANT POWER FACTOR $7,429 $25,300 Not Implemented
UD1086 # 11 Y:2024 11 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,817 $0 Not Implemented
MI0442 # 01 Y:2024 01 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $16,134 $240 Implemented
MI0442 # 02 Y:2024 02 2024 METER WASTE WATER $13,483 $956 Implemented
MI0442 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,876 $16,028 Not Implemented
MI0442 # 04 Y:2024 04 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $9,720 $159,280 Not Implemented
MI0442 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,918 $917 Not Implemented
MI0442 # 06 Y:2024 06 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,002 $70 Implemented
MZ0361 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,633 $6,555 Implemented
MZ0361 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,784 $1,000 Implemented
MZ0361 # 03 Y:2024 03 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,797 $4,800 Not Implemented
MZ0361 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $2,158 $1,750 Implemented
MZ0361 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,374 $117,036 Implemented
MZ0361 # 06 Y:2024 06 2024 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $45,827 $6,720 Not Implemented
MZ0361 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,882 $33,744 Implemented
MZ0361 # 08 Y:2024 08 2024 MINIMIZE WATER USAGE $71,580 $385,388 Not Implemented
MZ0361 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $322,316 $3,602,500 Not Implemented
UD1084 # 01 Y:2024 01 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,386 $0 Implemented
UD1084 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,258 $1,235 Not Implemented
UD1084 # 03 Y:2024 03 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,871 $6,080 Not Implemented
UD1084 # 04 Y:2024 04 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $47,804 $143,413 Not Implemented
UD1084 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $1,251 $3,985 Not Implemented
UD1084 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,134 $3,775 Implemented