Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
478
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0111 # 02 Y:2005 | 02 | 2005 | AIR CONDITION ONLY SPACE NECESSARY | $51,150 | $0 | Not Implemented |
TA0111 # 03 Y:2005 | 03 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $44,045 | $20,000 | Not Implemented |
TA0111 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,913 | $400 | Not Implemented |
TA0111 # 05 Y:2005 | 05 | 2005 | OPTIMIZE PLANT POWER FACTOR | $2,750 | $5,500 | Not Implemented |
TA0111 # 06 Y:2005 | 06 | 2005 | DISCONNECT BALLASTS | $1,660 | $140 | Not Implemented |
TA0111 # 07 Y:2005 | 07 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,370 | $10 | Not Implemented |
TA0110 # 01 Y:2005 | 01 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,425 | $0 | Not Implemented |
TA0110 # 02 Y:2005 | 02 | 2005 | OPTIMIZE PLANT POWER FACTOR | $6,850 | $13,700 | Not Implemented |
TA0110 # 03 Y:2005 | 03 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,925 | $0 | Not Implemented |
TA0110 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,880 | $1,080 | Not Implemented |
TA0110 # 05 Y:2005 | 05 | 2005 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,083 | $5,319 | Not Implemented |
TA0110 # 06 Y:2005 | 06 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,362 | $0 | Not Implemented |
TA0110 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $969 | $262 | Not Implemented |
TA0103 # 01 Y:2005 | 01 | 2005 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $12,460 | $8,170 | Not Implemented |
TA0103 # 02 Y:2005 | 02 | 2005 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,365 | $2,620 | Implemented |
TA0103 # 03 Y:2005 | 03 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $14,113 | $0 | Implemented |
TA0103 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,990 | $0 | Implemented |
TA0103 # 05 Y:2005 | 05 | 2005 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $700 | $1,070 | Implemented |
TA0095 # 01 Y:2005 | 01 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $17,820 | $1,035 | Not Implemented |
TA0095 # 02 Y:2005 | 02 | 2005 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $9,270 | $2,660 | Not Implemented |
TA0095 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,300 | $530 | Implemented |
TA0095 # 04 Y:2005 | 04 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,440 | $2,000 | Not Implemented |
TA0095 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,615 | $0 | Not Implemented |
TA0095 # 06 Y:2005 | 06 | 2005 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $270 | $0 | Not Implemented |
TA0095 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,370 | $0 | Not Implemented |