IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,345

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0344 # 07 Y:2008 07 2008 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $43,004 $11,201 Not Implemented
BD0344 # 08 Y:2008 08 2008 USE RADIANT HEATER FOR SPOT HEATING $16,854 $27,001 Not Implemented
UF0411 # 01 Y:2008 01 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,719 $4,557 Not Implemented
UF0411 # 02 Y:2008 02 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $47,620 $6,301 Not Implemented
UF0411 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,287 $40,292 Implemented
UF0411 # 04 Y:2008 04 2008 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,258 $461 Implemented
UF0411 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $1,200 $215 Implemented
UF0411 # 06 Y:2008 06 2008 RECOVER WASTE HEAT FROM EQUIPMENT $888 $364 Not Implemented
UF0411 # 07 Y:2008 07 2008 RECOVER WASTE HEAT FROM EQUIPMENT $62,348 $20,000 Not Implemented
UF0411 # 08 Y:2008 08 2008 RECOVER WASTE HEAT FROM EQUIPMENT $1,520 $1,000 Not Implemented
UF0411 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,144 $426 Implemented
UF0411 # 10 Y:2008 10 2008 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,946 $25,280 Not Implemented
UF0411 # 11 Y:2008 11 2008 MODIFY WORKLOAD $8,002 $0 Not Implemented
UF0411 # 12 Y:2008 12 2008 RECOVER WASTE HEAT FROM EQUIPMENT $6,419 $3,400 Not Implemented
UF0411 # 13 Y:2008 13 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $110,982 $0 Implemented
NC0375 # 01 Y:2008 01 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,790 $7,000 Not Implemented
NC0375 # 02 Y:2008 02 2008 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $15,885 $41,750 Not Implemented
NC0375 # 03 Y:2008 03 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,903 $7,500 Implemented
NC0375 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,473 $1,680 Implemented
NC0375 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,999 $4,820 Implemented
NC0375 # 06 Y:2008 06 2008 DEVELOP A REPAIR/REPLACE POLICY $1,686 $2,173 Implemented
UD0775 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $2,738 Implemented
UD0775 # 02 Y:2008 02 2008 INSTALL AUTOMATIC STACK DAMPER $650 $400 Implemented
UD0775 # 03 Y:2008 03 2008 INSULATE BARE EQUIPMENT $507 $130 Not Implemented
UD0775 # 04 Y:2008 04 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $416 $0 Not Implemented