IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,345

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1051 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $14,358 $18,834 Not Implemented
UD1051 # 08 Y:2023 08 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $33,383 $25,920 Not Implemented
UD1051 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $59,158 $92,100 Not Implemented
UD1051 # 10 Y:2023 10 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $969 $3,439 Not Implemented
UD1051 # 11 Y:2023 11 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,057 $18,480 Not Implemented
UD1051 # 12 Y:2023 12 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $633 $80 Not Implemented
MS0408 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $357 $1,634 n/a
MS0408 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $70,508 $548,100 n/a
MS0408 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,817 $0 n/a
MS0408 # 04 Y:2022 04 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,092 $12,955 n/a
MS0408 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $5,424 $0 n/a
LS2305 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $808 $90 Implemented
LS2305 # 02 Y:2023 02 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,419 $7,350 Implemented
LS2305 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $752 $900 Implemented
LS2305 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,787 $2,315 Implemented
UW2219 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,345 $0 Not Implemented
UW2219 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,427 $0 Not Implemented
UW2219 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,869 $2,080 Not Implemented
UW2218 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,995 $0 Not Implemented
UW2218 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,261 $2,080 Not Implemented
UW2218 # 03 Y:2022 03 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,559 $6,769 Not Implemented
CM1009 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $24,500 $8,000 Not Implemented
CM1009 # 02 Y:2022 02 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,200 $201,300 Implemented
CM1009 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $6,100 $96,500 Not Implemented
CM1009 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,380 $50 Not Implemented