IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

277

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0592 # 04 Y:2020 04 2020 MINIMIZE WATER USAGE $3,145 $2,100 Implemented
WV0592 # 05 Y:2020 05 2020 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,832 $4,720 Not Implemented
WV0592 # 07 Y:2020 07 2020 UPGRADE CONTROLS ON COMPRESSORS $1,361 $3,757 Not Implemented
WV0592 # 09 Y:2020 09 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $829 $3,850 Not Implemented
WV0592 # 08 Y:2020 08 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $964 $3,240 Implemented
WV0592 # 10 Y:2020 10 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $723 $1,312 Implemented
WV0592 # 11 Y:2020 11 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $397 $36 Implemented
WV0592 # 12 Y:2020 12 2020 DEVELOP A REPAIR/REPLACE POLICY $372 $303 Implemented
WV0592 # 13 Y:2020 13 2020 INSULATE BARE EQUIPMENT $157 $742 Implemented
WV0592 # 14 Y:2020 14 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $47 $250 Not Implemented
LE0486 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,558 $28,275 Implemented
LE0486 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,726 $7,400 Not Implemented
LE0486 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,256 $65,000 Not Implemented
LE0486 # 04 Y:2019 04 2019 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $15,202 $21,000 Not Implemented
LE0486 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,174 $1,540 Implemented
LE0486 # 02 Y:2019 02 2019 INSTALL TIMERS AND/OR THERMOSTATS $8,764 $720 Implemented
LE0486 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $57,024 $500 Not Implemented
LE0479 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,667 $6,000 Not Implemented
LE0479 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $339 $310 Not Implemented
LE0479 # 02 Y:2019 02 2019 RECOVER WASTE HEAT FROM EQUIPMENT $9,431 $9,000 Not Implemented
LE0479 # 08 Y:2019 08 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,624 $75,000 Not Implemented
LE0479 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $34 $105 Not Implemented
LE0479 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,351 $15,513 Implemented
LE0479 # 03 Y:2019 03 2019 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $20,437 $22,500 Not Implemented
LE0479 # 05 Y:2019 05 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,469 $3,500 Not Implemented