Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
218
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0191 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,474 | $3,500 | Not Implemented |
MZ0191 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,535 | $920 | Not Implemented |
MZ0191 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,229 | $3,500 | Not Implemented |
MZ0191 # 06 Y:2015 | 06 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,328 | $2,000 | Not Implemented |
MZ0191 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,548 | $22,425 | Not Implemented |
MZ0191 # 08 Y:2015 | 08 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,458 | $0 | Implemented |
MZ0157 # 01 Y:2014 | 01 | 2014 | INSULATE BARE EQUIPMENT | $571 | $601 | Not Implemented |
MZ0157 # 02 Y:2014 | 02 | 2014 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $1,077 | $10,750 | Implemented |
MZ0157 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,149 | $30,133 | Implemented |
MZ0157 # 04 Y:2014 | 04 | 2014 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,223 | $17,400 | Not Implemented |
MZ0157 # 05 Y:2014 | 05 | 2014 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $3,840 | $9,600 | Implemented |
MZ0142 # 01 Y:2014 | 01 | 2014 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $5,862 | $6,500 | Not Implemented |
MZ0142 # 02 Y:2014 | 02 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $505 | $1,000 | Not Implemented |
MZ0142 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,716 | $2,500 | Not Implemented |
MZ0142 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $206 | $720 | Not Implemented |
MZ0142 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,435 | $31,000 | Implemented |
MZ0142 # 06 Y:2014 | 06 | 2014 | USE PHOTOCELL CONTROLS | $1,432 | $980 | Not Implemented |
MZ0116 # 01 Y:2013 | 01 | 2013 | USE PHOTOCELL CONTROLS | $2,023 | $900 | Not Implemented |
MZ0116 # 02 Y:2013 | 02 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,131 | $0 | Not Implemented |
MZ0116 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $890 | $1,000 | Not Implemented |
MZ0116 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,715 | $93,750 | Not Implemented |
MZ0116 # 05 Y:2013 | 05 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,431 | $1,160 | Not Implemented |
MZ0130 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,164 | $1,000 | Implemented |
MZ0130 # 02 Y:2013 | 02 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,092 | $5,800 | Not Implemented |
MZ0130 # 03 Y:2013 | 03 | 2013 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $17,041 | $5,200 | Implemented |