IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,345

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0417 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,602 $25,000 Implemented
LE0417 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,120 $22,015 Implemented
LE0417 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,659 $62,300 Implemented
UM0465 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $3,158 $5,250 Not Implemented
UM0465 # 02 Y:2016 02 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,640 $2,000 Not Implemented
UM0465 # 03 Y:2016 03 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $485 $1,029 Not Implemented
UM0465 # 04 Y:2016 04 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,573 $0 Not Implemented
UM0465 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,361 $150 Not Implemented
TT0171 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,961 $156,286 Implemented
TT0171 # 02 Y:2016 02 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $16,670 $105,000 Not Implemented
TT0171 # 03 Y:2016 03 2016 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $11,200 $110,000 Implemented
TT0171 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,210 $0 Not Implemented
TT0171 # 05 Y:2016 05 2016 UPGRADE CONTROLS ON COMPRESSORS $2,435 $800 Implemented
TT0171 # 06 Y:2016 06 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $544 $1,100 Not Implemented
TT0171 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $676 $1,366 Implemented
UK1601 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $5,045 $7,350 Not Implemented
UK1601 # 02 Y:2016 02 2016 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $19,178 $60,000 Not Implemented
UK1601 # 03 Y:2016 03 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,523 $0 Not Implemented
UK1601 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,569 $3,000 Not Implemented
UK1601 # 05 Y:2016 05 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,706 $750 Not Implemented
UK1601 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,798 $34,110 Not Implemented
UK1601 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $849 $175 Not Implemented
UK1601 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $495 $707 Not Implemented
UK1601 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,047 $1,200 Not Implemented
UK1601 # 10 Y:2016 10 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $315 $0 Not Implemented