Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,345
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0417 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,602 | $25,000 | Implemented |
LE0417 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,120 | $22,015 | Implemented |
LE0417 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,659 | $62,300 | Implemented |
UM0465 # 01 Y:2016 | 01 | 2016 | INSTALL OCCUPANCY SENSORS | $3,158 | $5,250 | Not Implemented |
UM0465 # 02 Y:2016 | 02 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,640 | $2,000 | Not Implemented |
UM0465 # 03 Y:2016 | 03 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $485 | $1,029 | Not Implemented |
UM0465 # 04 Y:2016 | 04 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,573 | $0 | Not Implemented |
UM0465 # 05 Y:2016 | 05 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,361 | $150 | Not Implemented |
TT0171 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,961 | $156,286 | Implemented |
TT0171 # 02 Y:2016 | 02 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $16,670 | $105,000 | Not Implemented |
TT0171 # 03 Y:2016 | 03 | 2016 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $11,200 | $110,000 | Implemented |
TT0171 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,210 | $0 | Not Implemented |
TT0171 # 05 Y:2016 | 05 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $2,435 | $800 | Implemented |
TT0171 # 06 Y:2016 | 06 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $544 | $1,100 | Not Implemented |
TT0171 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $676 | $1,366 | Implemented |
UK1601 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $5,045 | $7,350 | Not Implemented |
UK1601 # 02 Y:2016 | 02 | 2016 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $19,178 | $60,000 | Not Implemented |
UK1601 # 03 Y:2016 | 03 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,523 | $0 | Not Implemented |
UK1601 # 04 Y:2016 | 04 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,569 | $3,000 | Not Implemented |
UK1601 # 05 Y:2016 | 05 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,706 | $750 | Not Implemented |
UK1601 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,798 | $34,110 | Not Implemented |
UK1601 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $849 | $175 | Not Implemented |
UK1601 # 08 Y:2016 | 08 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $495 | $707 | Not Implemented |
UK1601 # 09 Y:2016 | 09 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,047 | $1,200 | Not Implemented |
UK1601 # 10 Y:2016 | 10 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $315 | $0 | Not Implemented |