IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

144

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0348 # 07 Y:2023 07 2023 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,203 $4,132 n/a
MZ0348 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,751 $5,386 n/a
MZ0348 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $3,429 $830 n/a
MZ0348 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,917 $1,548 n/a
MZ0348 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,900 $2,660 n/a
MZ0348 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,209 $3,330 n/a
MZ0348 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $13,016 $3,000 n/a
OK1073 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $32,771 $39,489 Not Implemented
OK1073 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,707 $1,176 Implemented
OK1073 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,548 $12,334 Not Implemented
OK1073 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,129 $0 Implemented
OK1073 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,161 $9,927 Implemented
MZ0307 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,100 $6,233 Implemented
MZ0307 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $809 $1,130 Implemented
MZ0307 # 01 Y:2021 01 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,351 $1,250 Not Implemented
OK1034 # 06 Y:2020 06 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,799 $0 Implemented
OK1034 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,763 $4,560 Implemented
OK1034 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,014 $2,340 Not Implemented
OK1034 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $8,582 $18,054 Not Implemented
OK1034 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $459 $320 Implemented
OK1034 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,909 $49,013 Implemented
OK1034 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $536 $713 Not Implemented
MZ0275 # 04 Y:2020 04 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,201 $3,250 Not Implemented
MZ0275 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,790 $7,081 Not Implemented
MZ0275 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $5,169 $10,500 Not Implemented