IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,221

matching recommendations
Reset
NAICS 3331 Agriculture, Construction, and Mining Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0108 # 04 Y:2025 04 2025 INSTALL OCCUPANCY SENSORS $686 $1,621 n/a
NL0108 # 02 Y:2025 02 2025 UPGRADE OBSOLETE EQUIPMENT $93,844 $220,000 n/a
NL0108 # 03 Y:2025 03 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,935 $695 n/a
NL0108 # 01 Y:2025 01 2025 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $510,000 $2,500,000 n/a
WV0670 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,691 $8,244 Not Implemented
WV0670 # 03 Y:2024 03 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,770 $43,200 Not Implemented
WV0670 # 08 Y:2024 08 2024 DEVELOP A REPAIR/REPLACE POLICY $1,123 $1,296 Implemented
WV0670 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,506 $770 Implemented
WV0670 # 11 Y:2024 11 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $237 $1,029 Implemented
WV0670 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,114 $61,425 Not Implemented
WV0670 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $878 $581 Implemented
WV0670 # 04 Y:2024 04 2024 UPGRADE CONTROLS ON COMPRESSORS $8,001 $13,171 Not Implemented
WV0670 # 02 Y:2024 02 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $15,802 $77,610 Not Implemented
WV0670 # 10 Y:2024 10 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $666 $148 Implemented
WV0670 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,211 $1,154 Implemented
NL0095 # 06 Y:2024 06 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $647 $2,000 Not Implemented
NL0095 # 02 Y:2024 02 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $14,437 $500 Not Implemented
NL0095 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $652 $373 Not Implemented
NL0095 # 03 Y:2024 03 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,145 $2,000 Not Implemented
NL0095 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,285 $1,500 Implemented
NL0095 # 01 Y:2024 01 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $65,447 $72,000 Not Implemented
WM0216 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,412 $2,346 Not Implemented
WM0216 # 04 Y:2024 04 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $447 $2,948 Implemented
WM0216 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,835 $0 Implemented
WM0216 # 02 Y:2024 02 2024 USE COMPRESSOR AIR FILTERS $1,040 $3,270 Not Implemented