IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
NAICS 3331 Agriculture, Construction, and Mining Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0348 # 07 Y:2023 07 2023 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,203 $4,132 Not Implemented
MZ0348 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,751 $5,386 Implemented
MZ0348 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $3,429 $830 Not Implemented
MZ0348 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,917 $1,548 Implemented
MZ0348 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,900 $2,660 Not Implemented
MZ0348 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,209 $3,330 Not Implemented
MZ0348 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $13,016 $3,000 Implemented
MZ0265 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,740 $2,302 Not Implemented
MZ0265 # 08 Y:2019 08 2019 OPTIMIZE PLANT POWER FACTOR $14,079 $20,625 Implemented
MZ0265 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,033 $4,192 Implemented
MZ0265 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,079 $2,052 Implemented
MZ0265 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,922 $1,406 Implemented
MZ0265 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $5,073 $1,940 Implemented
MZ0265 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $9,670 $3,552 Not Implemented
MZ0265 # 01 Y:2019 01 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $22,096 $10,000 Implemented
MZ0265 # 09 Y:2019 09 2019 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,984 $2,731 Not Implemented
OK0998 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $92,926 $356,802 Not Implemented
OK0998 # 08 Y:2019 08 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,330 $1,074 Implemented
OK0998 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,516 $0 Not Implemented
OK0998 # 12 Y:2019 12 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,003 $0 Implemented
OK0998 # 02 Y:2019 02 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $24,200 $6,920 Not Implemented
OK0998 # 04 Y:2019 04 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,603 $400 Implemented
OK0998 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,022 $13,860 Not Implemented
OK0998 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,784 $2,853 Implemented
OK0998 # 05 Y:2019 05 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,207 $21,000 Not Implemented