IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

165

matching recommendations
Reset
NAICS 3331 Agriculture, Construction, and Mining Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0006 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,942 $0 Not Implemented
NT0006 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,685 $0 Not Implemented
NT0006 # 01 Y:2023 01 2023 UPGRADE CONTROLS ON COMPRESSORS $34,941 $10,056 Not Implemented
NT0006 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $12,361 $27,064 Not Implemented
NT0006 # 05 Y:2023 05 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $16,552 $0 Not Implemented
NT0006 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $151,941 $2,205,000 Not Implemented
AM0848 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,821 $1,000 Implemented
AM0848 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,136 $13 Not Implemented
AM0848 # 04 Y:2022 04 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $149 $408 Implemented
AM0848 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $889 $1,568 Implemented
AM0822 # 02 Y:2021 02 2021 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,940 $15,000 Not Implemented
AM0822 # 07 Y:2021 07 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $5,200 $1,350 Not Implemented
AM0822 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,370 $30,000 Not Implemented
AM0822 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,070 $2,117 Not Implemented
AM0822 # 06 Y:2021 06 2021 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $75 $152 Not Implemented
AM0822 # 04 Y:2021 04 2021 OPTIMIZE PLANT POWER FACTOR $21,250 $22,150 Not Implemented
AM0822 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,600 $3,400 Not Implemented
AM0811 # 01 Y:2020 01 2020 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,123 $20,000 Implemented
AM0811 # 06 Y:2020 06 2020 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $460 $200 Implemented
AM0811 # 03 Y:2020 03 2020 PAY UTILITY BILLS ON TIME $7,866 $0 Implemented
AM0811 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,900 $60 Not Implemented
AM0811 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,530 $255 Implemented
AM0811 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,800 $6,000 Implemented
AM0809 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,060 $13,360 Not Implemented
AM0809 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,340 $60,200 Implemented