IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 33312 Construction Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1014 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,017 $1,750 Implemented
OK1014 # 02 Y:2019 02 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $3,114 $3,878 Implemented
OK1014 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,926 $9,064 Implemented
OK1010 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,016 $11,730 Not Implemented
OK1010 # 06 Y:2019 06 2019 USE OPTIMUM THICKNESS INSULATION $11,922 $53,750 Not Implemented
OK1010 # 05 Y:2019 05 2019 RECOVER WASTE HEAT FROM EQUIPMENT $1,024 $3,948 Not Implemented
OK1010 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $885 $1,760 Implemented
OK1010 # 03 Y:2019 03 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,032 $947 Implemented
OK1010 # 02 Y:2019 02 2019 INSTALL TIMERS AND/OR THERMOSTATS $7,438 $1,936 Implemented
OK1010 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $4,905 $12,400 Implemented
CL1902 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $48 $0 Implemented
CL1902 # 03 Y:2019 03 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,447 $39,883 Implemented
CL1902 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,975 $18,832 Implemented
OK0998 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,516 $0 Not Implemented
OK0998 # 10 Y:2019 10 2019 OPTIMIZE PLANT POWER FACTOR $11,401 $14,332 Not Implemented
OK0998 # 11 Y:2019 11 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,712 $0 Not Implemented
OK0998 # 12 Y:2019 12 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,003 $0 Implemented
OK0998 # 08 Y:2019 08 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,330 $1,074 Implemented
OK0998 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,784 $2,853 Implemented
OK0998 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,022 $13,860 Not Implemented
OK0998 # 05 Y:2019 05 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,207 $21,000 Not Implemented
OK0998 # 04 Y:2019 04 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,603 $400 Implemented
OK0998 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $24,407 $30,000 Not Implemented
OK0998 # 02 Y:2019 02 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $24,200 $6,920 Not Implemented
OK0998 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $92,926 $356,802 Not Implemented