Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
53
matching recommendationsNAICS | 333131 | Mining Machinery and Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0608 # 07 Y:2013 | 07 | 2013 | USE PHOTOCELL CONTROLS | $658 | $966 | Not Implemented |
OR0608 # 01 Y:2013 | 01 | 2013 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $32,340 | $0 | Implemented |
OR0608 # 02 Y:2013 | 02 | 2013 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $107,138 | $55,641 | Implemented |
OR0608 # 03 Y:2013 | 03 | 2013 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $125,546 | $300,000 | Not Implemented |
OR0608 # 04 Y:2013 | 04 | 2013 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $11,970 | $41,000 | Not Implemented |
OR0608 # 05 Y:2013 | 05 | 2013 | INSULATE BARE EQUIPMENT | $518 | $135 | Not Implemented |
OR0608 # 06 Y:2013 | 06 | 2013 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $2,698 | $1,220 | Not Implemented |
WV0379 # 10 Y:2008 | 10 | 2008 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,723 | $1,000 | Implemented |
WV0379 # 08 Y:2008 | 08 | 2008 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $6,364 | $8,200 | Not Implemented |
WV0379 # 09 Y:2008 | 09 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,760 | $0 | Implemented |
WV0379 # 11 Y:2008 | 11 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $2,610 | $763 | Implemented |
WV0379 # 13 Y:2008 | 13 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,578 | $4,167 | Implemented |
WV0379 # 12 Y:2008 | 12 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,133 | $160 | Implemented |
WV0379 # 04 Y:2008 | 04 | 2008 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $10,617 | $13,800 | Implemented |
WV0379 # 03 Y:2008 | 03 | 2008 | ADJUST BURNERS FOR EFFICIENT OPERATION | $19,217 | $2,000 | Not Implemented |
WV0379 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,378 | $60,703 | Implemented |
WV0379 # 01 Y:2008 | 01 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $72,979 | $113,775 | Implemented |
WV0379 # 05 Y:2008 | 05 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,262 | $1,080 | Implemented |
WV0379 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,550 | $0 | Implemented |
WV0379 # 06 Y:2008 | 06 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,977 | $700 | Implemented |
WV0379 # 15 Y:2008 | 15 | 2008 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $700 | $1,125 | Implemented |
WV0379 # 14 Y:2008 | 14 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,500 | $2,050 | Implemented |
MZ0008 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22 | $23 | Implemented |
MZ0008 # 05 Y:2007 | 05 | 2007 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $812 | $0 | Implemented |
MZ0008 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,289 | $800 | Implemented |