IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

374

matching recommendations
Reset
NAICS 333132 Oil and Gas Field Machinery and Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0630 # 04 Y:2022 04 2022 MINIMIZE WATER USAGE $706 $2,559 Implemented
WV0630 # 01 Y:2022 01 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,322 $44,160 Not Implemented
WV0630 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $305 $510 Implemented
WV0630 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $371 $911 Implemented
WV0630 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,523 $279 Implemented
WV0630 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $2,677 $7,291 Implemented
WV0630 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $405 $1,431 Implemented
OK1068 # 03 Y:2022 03 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $5,553 $3,192 Implemented
OK1068 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,141 $1,208 Implemented
OK1068 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,103 $0 Implemented
OK1068 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,561 $18,463 Not Implemented
OK1068 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,325 $5,412 Implemented
OK1068 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $830 $0 Not Implemented
LS2208 # 05 Y:2022 05 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $975 $240 Not Implemented
LS2208 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,440 $14,643 Implemented
LS2208 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $651 $50 Not Implemented
LS2208 # 01 Y:2022 01 2022 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $378 $10 Not Implemented
LS2208 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $7,289 $200 Implemented
LS2208 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,527 $450 Implemented
LS2208 # 06 Y:2022 06 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,660 $2,800 Not Implemented
LS2208 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $304 $114 Not Implemented
LS2208 # 09 Y:2022 09 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $15,212 $215,340 Not Implemented
OK1064 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,414 $774 Implemented
OK1064 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,321 $22,000 Implemented
OK1064 # 01 Y:2022 01 2022 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $9,509 $2,061 Not Implemented