Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews starting with December 31, 2023
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2023, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
Learn More:
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews starting with December 31, 2023
*See Full Grant Solicitation for full qualification and selection details.
669
matching recommendationsNAICS | 3332 | Industrial Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0025 # 08 Y:2023 | 08 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $431 | $0 | n/a |
MU0025 # 06 Y:2023 | 06 | 2023 | USE OPTIMUM TEMPERATURE | $1,361 | $0 | n/a |
MU0025 # 05 Y:2023 | 05 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $382 | $690 | n/a |
MU0025 # 04 Y:2023 | 04 | 2023 | KEEP EQUIPMENT CLEAN | $332 | $0 | n/a |
MU0025 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $37 | $50 | n/a |
MU0025 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,096 | $0 | n/a |
MU0025 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,630 | $360 | n/a |
MU0025 # 09 Y:2023 | 09 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $13,952 | $19,852 | n/a |
MU0025 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,434 | $2,876 | n/a |
MU0025 # 10 Y:2023 | 10 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,348 | $9,576 | n/a |
MI0423 # 06 Y:2023 | 06 | 2023 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $6,580 | $1,455 | Not Implemented |
MI0423 # 08 Y:2023 | 08 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,131 | $1,500 | Implemented |
MI0423 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $4,508 | $1,250 | Implemented |
MI0423 # 10 Y:2023 | 10 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $277 | $1,360 | Implemented |
MI0423 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $22,808 | $580 | Implemented |
MI0423 # 05 Y:2023 | 05 | 2023 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $9,196 | $27,500 | Not Implemented |
MI0423 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $41,834 | $0 | Implemented |
MI0423 # 04 Y:2023 | 04 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,785 | $37,678 | Implemented |
MI0423 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,513 | $51,984 | Implemented |
MI0423 # 09 Y:2023 | 09 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $1,771 | $900 | Not Implemented |
MU0023 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $517 | $162 | n/a |
MU0023 # 02 Y:2023 | 02 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $132,126 | $0 | n/a |
MU0023 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,416 | $480 | n/a |
MU0023 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $504 | $1,459 | n/a |
MU0023 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $127,926 | $136,639 | n/a |