IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

749

matching recommendations
Reset
NAICS 3332 Industrial Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0051 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,969 $3,393 Implemented
BS0051 # 03 Y:2015 03 2015 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $638 $259 Implemented
BS0051 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $396 $1,280 Implemented
BS0051 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $909 $15 Not Implemented
MI0272 # 01 Y:2015 01 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $108,119 $1,400 Not Implemented
MI0272 # 02 Y:2015 02 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $59,120 $60,000 Not Implemented
MI0272 # 03 Y:2015 03 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $21,227 $27,707 Implemented
MI0272 # 04 Y:2015 04 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,994 $80 Not Implemented
MI0272 # 05 Y:2015 05 2015 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $4,265 $11,000 Not Implemented
MI0272 # 06 Y:2015 06 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,714 $2,680 Not Implemented
MI0272 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $1,059 $373 Not Implemented
MI0272 # 08 Y:2015 08 2015 USE PHOTOCELL CONTROLS $1,053 $360 Not Implemented
MI0272 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $811 $3,060 Implemented
MI0272 # 10 Y:2015 10 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $727 $2,044 Not Implemented
MI0272 # 11 Y:2015 11 2015 USE OPTIMUM THICKNESS INSULATION $88 $360 Not Implemented
MI0271 # 01 Y:2015 01 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $49,400 $1,400 Not Implemented
MI0271 # 02 Y:2015 02 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $32,947 $40,065 Not Implemented
MI0271 # 03 Y:2015 03 2015 MINIMIZE WATER USAGE $15,193 $16,600 Implemented
MI0271 # 04 Y:2015 04 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,862 $3,960 Not Implemented
MI0271 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,939 $1,660 Not Implemented
MI0271 # 06 Y:2015 06 2015 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $4,265 $11,000 Implemented
MI0271 # 07 Y:2015 07 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,527 $6,000 Not Implemented
MI0271 # 08 Y:2015 08 2015 USE PHOTOCELL CONTROLS $2,361 $1,080 Not Implemented
MI0271 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,647 $80 Not Implemented
MI0271 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,369 $4,590 Implemented