Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
761
matching recommendationsNAICS | 33324 | Industrial Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2512 # 05 Y:2025 | 05 | 2025 | REPLACE BOILER | $31,301 | $286,589 | n/a |
LS2512 # 04 Y:2025 | 04 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $27,997 | $144,549 | n/a |
LS2512 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,432 | $1,275 | n/a |
LS2512 # 02 Y:2025 | 02 | 2025 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $16,150 | $25,000 | n/a |
LS2512 # 03 Y:2025 | 03 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,381 | $25,003 | n/a |
MU0062 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $2,520 | $98 | n/a |
MU0062 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,013 | $1,482 | n/a |
MU0062 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $235 | $530 | n/a |
MU0062 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,453 | $260 | n/a |
MU0062 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,416 | $780 | n/a |
MU0062 # 05 Y:2024 | 05 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $216 | $0 | n/a |
MU0062 # 01 Y:2024 | 01 | 2024 | COVER OPEN TANKS | $10,932 | $2,523 | n/a |
GT0985 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,512 | $5,863 | n/a |
GT0985 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $111 | $200 | n/a |
GT0985 # 08 Y:2024 | 08 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $38,752 | $438,980 | n/a |
GT0985 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,117 | $1,850 | n/a |
GT0985 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $182 | $200 | n/a |
GT0985 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $3,635 | $4,650 | n/a |
GT0985 # 02 Y:2024 | 02 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $164 | $90 | n/a |
GT0985 # 01 Y:2024 | 01 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $33,932 | $2,100 | n/a |
GT0985 # 09 Y:2024 | 09 | 2024 | OPTIMIZE PLANT POWER FACTOR | $563 | $3,003 | n/a |
UF0617 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $83,700 | $322,608 | Not Implemented |
UF0617 # 04 Y:2024 | 04 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,230 | $5,280 | Implemented |
UF0617 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,599 | $49,000 | Not Implemented |
UF0617 # 02 Y:2024 | 02 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $13,015 | $12,416 | Implemented |