Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
749
matching recommendationsNAICS | 33324 | Industrial Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0942 # 06 Y:2020 | 06 | 2020 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $113,048 | $690,000 | Not Implemented |
GT0942 # 07 Y:2020 | 07 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $114,607 | $699,103 | Not Implemented |
IP0128 # 01 Y:2019 | 01 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $331 | $0 | Implemented |
IP0128 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,334 | $76 | Implemented |
IP0128 # 03 Y:2019 | 03 | 2019 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $1,067 | $66 | Not Implemented |
IP0128 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $2,633 | $1,575 | Implemented |
IP0128 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,549 | $36,977 | Implemented |
OR0726 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,581 | $7,570 | Implemented |
OR0726 # 02 Y:2019 | 02 | 2019 | REDUCE VENTILATION AIR | $1,259 | $0 | Implemented |
OR0726 # 03 Y:2019 | 03 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,031 | $3,570 | Not Implemented |
LS1909 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $442 | $25 | Not Implemented |
LS1909 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,322 | $1,222 | Implemented |
LS1909 # 03 Y:2019 | 03 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $2,121 | $585 | Implemented |
LS1909 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $980 | $320 | Not Implemented |
LS1909 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $447 | $300 | Not Implemented |
LS1909 # 06 Y:2019 | 06 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $651 | $635 | Not Implemented |
IC0218 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,997 | $8,799 | Not Implemented |
IC0218 # 02 Y:2019 | 02 | 2019 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $63,690 | $6,300 | Not Implemented |
IC0218 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,151 | $14,700 | Not Implemented |
IC0218 # 04 Y:2019 | 04 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,883 | $8,244 | Not Implemented |
MZ0276 # 01 Y:2019 | 01 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $155 | $60 | Implemented |
MZ0276 # 02 Y:2019 | 02 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $249 | $1,040 | Implemented |
MZ0276 # 03 Y:2019 | 03 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,641 | $180 | Implemented |
MZ0276 # 04 Y:2019 | 04 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $44,070 | $184,040 | Implemented |
MZ0276 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $367 | $120 | Implemented |