IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

459

matching recommendations
Reset
NAICS 3333 Commercial and Service Industry Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0529 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,775 $250 Not Implemented
SU0529 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,688 $6,050 Not Implemented
SU0529 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $23,544 $39,388 Not Implemented
SU0529 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $158 $274 Not Implemented
SU0529 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,318 $2,488 Not Implemented
SU0529 # 08 Y:2023 08 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,392 $24,000 Not Implemented
SU0529 # 09 Y:2023 09 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $99 $494 Not Implemented
SU0529 # 01 Y:2023 01 2023 DISCONNECT BALLASTS $670 $0 Not Implemented
UU0208 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $230 $107 Implemented
UU0208 # 05 Y:2022 05 2022 INSTALL SKYLIGHTS $3,058 $10,560 Not Implemented
UU0208 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,292 $7,290 Implemented
UU0208 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $4,445 $12,840 Implemented
UU0208 # 02 Y:2022 02 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,476 $127,045 Implemented
UU0208 # 01 Y:2022 01 2022 USE POWER DURING OFF-PEAK PERIODS $9,375 $9,500 Not Implemented
SU0514 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,774 $3,179 Not Implemented
SU0514 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46 $49 Not Implemented
SU0514 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,996 $9,943 Not Implemented
SU0514 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,219 $1,953 Not Implemented
SU0514 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $22,430 $675 Not Implemented
SU0514 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,008 $0 Not Implemented
DL0208 # 12 Y:2022 12 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $436 $2,500 Implemented
DL0208 # 11 Y:2022 11 2022 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,359 $7,840 Not Implemented
DL0208 # 10 Y:2022 10 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,982 $55,000 Implemented
DL0208 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,770 $33,570 Implemented
DL0208 # 08 Y:2022 08 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,331 $2,230 Implemented